Retaining Wall Earthwork

Retaining Wall Base Prep & Excavation in Edison

Edison Excavation does the earthwork that determines whether a retaining wall holds: the benched cut into the slope, the compacted stone base course, and the drainage behind the block. We prepare walls for your builder or hardscaper, and build small gravity walls start to finish where no engineering is needed.

The parts that get buried

The parts that get buried

Once the wall goes up, the base and drainage are hidden for good. That's why they have to be right the first time.

Cut and Benched to Stay Put

The slope is cut back and benched so the ground holds during the build, and the base trench is dug to depth on laser grade.

A Level Base Course

Crusher run placed and compacted in lifts, then screeded dead level. When the first course goes down fast and true, the rest of the wall follows.

Drainage Behind the Wall

Clean 3/4-inch stone and perforated pipe at the base of the wall, daylighted so water can escape. Walls fail from water pressure, not soil weight.

Excavation partner for wall builders

Many skilled wall builders would rather set block than run machines. We handle the excavation side: cut, bench, trench, base course, drainage, and compacted backfill behind the finished wall. The 5 to 6 ton excavator takes on the larger cuts, and the mini reaches backyards where the slope runs tight to a fence.

  • Where we work

    For garden-scale gravity walls that don't need engineering, we can build the whole wall, base to cap. One straightforward note: in New Jersey, walls taller than about 4 feet usually require an engineered design and a permit. We'll tell you that at the site walk, and we're glad to dig to the engineer's spec once you have one.

What happens after you call

From the site walk to the final cleanup

  1. 1. Site Walk

    We visit the property by appointment, check access and any constraints, and go over your plans or what you have in mind.

  2. 2. Marking & Layout

    The layout is set on the ground with laser accuracy. Depths, lines, and elevations are marked before any digging starts.

  3. 3. The Work

    The right machine for the access comes in, ground protection goes down where needed, and disturbance to lawns, trees, and hardscape is kept to a minimum.

  4. 4. Clean Handover

    You're left with a site ready for the next step and a yard that's still in one piece.

Frequently Asked Questions

In most NJ towns, walls over about 4 feet, or walls with a load above them like a driveway, need an engineered design and a permit. Below that, a well-built gravity wall usually doesn't. We'll give you an honest read at the site walk, and your township's construction office has the final word.

Planning a wall? Let's look at the slope before anyone orders block.

Site visits are by appointment. Share a few details about the project and a time gets set to walk the property together.