Foundation Excavation for Edison Additions & Garages

Edison Excavation opens footing and foundation trenches for home additions and accessory buildings, cut to the depth and line shown on your drawings. The goal is a clean dig the inspector can sign off on, with the rest of the yard left in one piece.

Footing trenches dug and set with rebar for a new home foundation on a residential street.
What the dig includes

What the dig includes

One goal: hand the next crew a site they can work on right away, with nothing to redo.

Cut to the Drawings

The engineer or architect sets the footing depth, width, and elevations. Those numbers get staked out and held as the trench goes down, so the forms crew is not chasing a bottom that wanders.

Soil Kept Sorted

Topsoil and subsoil go in separate piles. Clean fill can stay on site for backfill or leave by truck, and the lawn and planting beds are protected throughout.

Trenches Ready for Forms

Straight walls, a cleaned-out bottom with no loose spoil left in it, and compaction where the spec asks for it. A firm base for footings and forms.

Aerial view of a concrete truck pouring footings into an excavated foundation outline.

Machines sized to your lot

An addition shouldn't cost you the backyard. The fleet runs from a tracked mini skid steer narrow enough for a backyard gate up to a 5 to 6 ton excavator, so a cramped side yard can still get a proper foundation dug without tearing up the property on the way in.

  • Where we work

    Sunroom, detached garage, pool house, or shed footing, the approach is the same: plan the route in, put down ground protection where it's needed, and keep the disturbance tight to the dig.

The 36-inch rule and where it comes from

New Jersey builds homes under the 2021 International Residential Code, New Jersey edition. Its climate table, Table R301.2, divides the state into two frost zones. Middlesex and Mercer Counties, and every county north of them, Union included, fall in the northern zone, where the frost depth is 36 inches. A footing has to bottom out below that line.

The reason is simple physics. Wet soil that freezes expands and lifts whatever rests on it, then drops it again in the thaw. A garage slab can ride that cycle for years before the cracks show; a footing under a bedroom addition cannot. Digging past 36 inches puts the base of the wall in ground that stays unfrozen through a hard Jersey winter.

Thirty-six inches is the floor, not the target. An engineer may push a footing deeper to reach firmer soil, step it down a slope, or match an existing foundation. Those numbers come off your drawings, and the trench gets cut to them.

Glacial ground under north Middlesex

The Perth Amboy Moraine, a ridge of debris left where the Laurentide Ice Sheet stopped, runs from Perth Amboy through Woodbridge, Edison, and Metuchen and straddles the Edison and South Plainfield border. Only the far northeast corner of Middlesex County was glaciated. Most of the rest sits on Piedmont rock and soils, with coastal plain to the south.

What that means for a footing: ground left by a glacier can be a mix of materials, and it can hold buried cobbles or boulders that nobody knew about. Nobody can tell you what is three feet under your particular lawn by looking at a map. A site walk and, where the job warrants it, a test pit dug ahead of time show what the trench will actually run into.

How a test pit works

Who calls 811, and how far ahead

When a homeowner hires a contractor to dig, the contractor is the one responsible for the NJ One Call ticket. State law (N.J.S.A. 48:2-82 and N.J.A.C. 14:2-3.1) requires that notice at least three full business days before the dig, with weekends and holidays left out of the count, and no more than 10 business days ahead. A routine ticket stays good for 45 business days.

The utilities mark their own lines, and the electric company marks its service up to the meter. Anything wired after the meter belongs to the owner and does not get marked: the feed to a detached garage you are expanding, a lamp post, the line out to a shed. For a garage or addition footing those private runs often cross the footprint, so point them out before layout. Within 2 feet on either side of any marked line, the digging is done by hand.

Edison permits that can come up on a footing job

The building permit for the addition or garage itself comes from your construction office. Edison Township's published permit flow charts list a few others that earthwork can trigger. A soil import or export permit applies when 10 cubic yards or more of soil comes onto or leaves the site. A site improvement permit applies when the work adds more than 500 square feet of new impervious coverage or disturbs 1,250 square feet; below that, drainage improvements or grading changes still need one, and the final call is made at zoning permit review.

A little arithmetic shows how fast the soil line arrives. Footing trenches around a 24 by 24 foot garage add up to 96 feet of trench. At 2 feet wide and 3.5 feet deep that is 672 cubic feet, or about 25 cubic yards, before any slab excavation. If that spoil leaves the property, it is well past 10 yards.

These come from the township's charts, so confirm the current rules with Edison before you plan around them. In Metuchen, Piscataway, Woodbridge, Linden, or any other town, check with the municipality's construction or engineering office, since each one runs its own process.

When the state erosion law applies

New Jersey's Soil Erosion and Sediment Control Act, Chapter 251 of the 1975 laws, requires a certified erosion control plan for projects that disturb more than 5,000 square feet. A modest addition may stay under that. A new house on a cleared lot, or a garage plus a long driveway and regrading, can go over, and the count is the disturbed area, not only the building footprint.

In Middlesex County the plan goes to the Freehold Soil Conservation District, which covers Middlesex and Monmouth. Linden, Rahway, and Plainfield are in Union County, which the Somerset-Union Soil Conservation District handles. A certification is valid for three and a half years. Jobs under 5,000 square feet fall outside the Act, though the district may still want an exemption application on file.

From open trench to backfill

A footing trench is only half the job. Once the footing is poured and the walls are up and approved, the excavated soil goes back against the foundation. Clean subsoil gets placed in layers rather than dumped in one push, and the saved topsoil goes on last, pitched so roof water runs away from the new wall instead of toward it.

Anything that cannot go back, such as rubble from an old slab, roots, or more soil than the grade needs, leaves in the 7-yard dump truck. The site walk is where that split gets decided, along with the route in, where the spoil pile sits while the walls go up, and which plantings need to be fenced off. Send the drawings ahead of time and the walk can cover all of it in one visit.

What happens after you call

From the site walk to the final cleanup

  1. 1. Site Walk

    We visit the property by appointment, check access and any constraints, and go over your plans or what you have in mind.

  2. 2. Marking & Layout

    The layout is marked on the ground from the plan. Depths, lines, and elevations are set out before any digging starts.

  3. 3. The Work

    The right machine for the access comes in, ground protection goes down where needed, and disturbance to lawns, trees, and hardscape is kept to a minimum.

  4. 4. Clean Handover

    You're left with a site ready for the next step and a yard that's still in one piece.

Frequently Asked Questions

The smallest one, a tracked skid steer, needs roughly 36 inches of clear width, so a standard backyard gate is usually enough and the fence stays up. Larger machines need more space. Access for the specific job gets confirmed on the site walk, and turf and hardscape along the route get protected.

Planning an addition? Send your plans and we'll look at the access.

Site visits are by appointment. Share a few details about the project and a time gets set to walk the property together.