Edison Excavation takes out inground pools around Edison, either as a partial fill-in that leaves the broken lower shell in place or a full removal that hauls out all of the concrete, liner, and steel. In both cases the hole is backfilled with clean fill in compacted lifts and graded back to lawn you can plant or build on.

Partial or full: two approaches

Partial or full: two approaches

The right choice depends on your plans for the yard and on what your township requires.

Partial Fill-In

The upper walls are removed, the floor is broken so water can drain, and the rubble stays at the bottom beneath clean fill compacted in lifts. It's the lower-cost option and works well for lawn or garden, where the town allows it.

Full Removal

All of the shell, liner, steel, and decking is broken out and hauled off before backfilling. It costs more, but leaves clean ground if you may build an addition, garage, or new pool there later.

Decking, Equipment & Final Grade

Surrounding concrete or paver decking and the equipment pad come out too, and the final grade pitches away from the house. Topsoil goes on top, ready for seed or sod.

How a filled pool stays level

A filled pool that settles later was almost always filled all at once: loose fill dumped in and a machine driven across the top. Water ponds on the intact floor, the fill softens, and the lawn drops. The fix is unglamorous: break the floor so it drains, place clean fill in layers, and compact each layer before the next one goes in.

  • Where we work

    A typical inground pool takes 60 to 90 truckloads of fill, so access is the main planning issue. The path from the street to the pool gets checked, the lawn and driveway along it get protected, and the NJ One Call 811 markout is requested before any digging.

  • What we protect

    The pool's electrical and gas lines are disconnected and capped by your licensed electrician or plumber before the breaking starts, so nothing live ends up under the new lawn.

Pool removal pricing

Typical New Jersey ranges, not our quote: a partial fill-in usually runs $4,000 to $8,000 and a full removal $4,000 to $16,000. Most of the cost is material and trucking: clean fill coming in, broken concrete and decking going out.

Size and depth set how much fill is needed, and access sets how quickly it goes in. A pool trucks can reach down a driveway is a different job from one behind the house through a side yard. The loads get counted during a site walk, and one number goes in writing.

See all excavation cost ranges

A pool counts as a structure under state code

People are often surprised that filling a hole in the backyard needs the same kind of permit as tearing down a garage. Under N.J.A.C. 5:23-2.14 it is unlawful to demolish a structure without first getting a construction permit from the local construction official, and New Jersey municipalities treat an inground pool fill-in as that kind of job.

The permit is where the town's own standards come in. In Edison, call the township's construction office; in Metuchen, Woodbridge, Linden, or wherever the pool sits, call that municipality's. Ask for the pool demolition checklist if they have one. It answers most of the questions on this page for your specific town, and the work gets planned to it.

What town checklists commonly ask for

Rules differ, but several New Jersey towns publish pool demolition requirements that share a pattern. Evesham, South Orange, and Bernards are examples. None of them are Edison's rules, and they are listed here only to show what a construction office may expect.

Concrete left in the hole as fill gets broken into pieces no bigger than about 3 to 4 inches. Rebar and other steel come out. So does the vinyl liner, the in-ground filtration piping, the wiring and conduit, and the gas piping that fed the heater. Only clean fill goes back in, and roughly 6 inches of topsoil finishes the surface. An inspector looks at the hole before backfill and again at the end.

That list explains why the price ranges are wide. Breaking a shell into fist-sized rubble and stripping every pipe takes more machine time than knocking the walls in, and a town that requires it is telling you what the job really involves.

Sixty truckloads in, one driveway to do it

If 60 to 90 loads of fill come in through one driveway, the route matters more than the pool. Before any work, the walk looks at the curb, the driveway surface, the side yard, overhead wires, and where a truck can dump without blocking the street. Sometimes the dump truck tips at the curb and the large skid steer carries fill back; sometimes a truck can back right to the edge of the pool.

In Edison, the township's published flow charts call for a soil import permit when 10 cubic yards or more of soil comes onto a site, a line every pool fill-in passes many times over. Work in the sidewalk, curb, or apron, the public right-of-way, needs a road opening permit from Public Works. Confirm both with the township. Outside Edison, check with the municipality's construction or engineering office.

Planning for what goes on top

Decide early what the ground will become. A lawn or a garden bed asks very little of the fill beyond being clean and compacted. A future patio, shed, or addition asks a lot more, and that usually points to a full removal so nothing hard is buried where footings might go later.

Write down the location of the old pool either way and keep the permit file. Whoever buys the house will want to know what is under the grass, and a closed permit with a final inspection answers that question cleanly.

Other demolition work

What happens after you call

From the site walk to the final cleanup

  1. 1. Site Walk

    We visit the property by appointment, check access and any constraints, and go over your plans or what you have in mind.

  2. 2. Marking & Layout

    The layout is marked on the ground from the plan. Depths, lines, and elevations are set out before any digging starts.

  3. 3. The Work

    The right machine for the access comes in, ground protection goes down where needed, and disturbance to lawns, trees, and hardscape is kept to a minimum.

  4. 4. Clean Handover

    You're left with a site ready for the next step and a yard that's still in one piece.

Frequently Asked Questions

As a New Jersey market range, not a quote: partial fill-ins often run $4,000 to $8,000, and full removals $4,000 to $16,000. Pool size, how much concrete and decking comes out, the fill trucked in, and machine access determine where yours falls. A written price follows the site visit.

Pool sitting unused? Let's turn it back into yard.